Electronics Weighbridge

Electronics Weighbridge - PIT LESS TYPE

Pit Less weighbridge, also known as surface mounted weighbridge, as the name suggests, is a weighbridge which is not mounted in a pit. It is installed on and above the road level hence raising the bridge from the road level to a significant height. Ramps are made on both the sides of the bridge to enable easy access and removal of trucks onto the bridge deck for weighing.

This type of weighbridge / Truck scale is most suitable where the excavation work for foundation is difficult or construction of pit is expensive. Since the structure is above ground level, vehicles can approach the weighbridge only from two directions where the ramps are provided. This type of weighbridge requires more space.

In Pitless Type Weighbridge RCC ramp work must be required at least 3 meters for both sides for easy movement of vehicle.

This type of weighbridges are useful where lot of rainfall takes place. Because of the bridge being at a significant height from the road level, the water does not accumulate under the bridge hence there is no threat to the weighbridge from the water. This type of Weighbridge is also useful where the user want to shift the weighbridge to other places very often, like construction sites. The foundation of this weighbridge is less costly and easy to build hence it is easy to make the foundation at a new place and shift the weighbridge to new location easily.

A truck to be weighed is directly driven to the platform of a weighbridge and hence, the platform is subjected to the entire load and vibrations created by a moving truck. Our weighbridge platforms (made of steel) are designed very carefully to withstand these loads without damage and is highly durable. The girders and plates used in our platform are selected very carefully and undergo stringent quality checks as per ISI & IS 2062 Grade.

This type of weighbridge sits above of the road surface and requires ramps on either end to allow the vehicles to access the platform. The amount of civil foundations work required is reduced for surface mounted scales, but the overall space requirement is more. Before purchasing, check the overall height of the ‘Weighbridge’. Higher decks need longer ramps, which increase the overall footprint of the weighbridge as well as the turning circle for vehicles approaching the bridge. Generally, surface mounted weighbridges require guide rails fixed on the sides of the platform, which help vehicles to be aligned centrally on the bridge. This type of installation is better suited when the bridge may need to be shifted, or for temporary (sometimes called ‘portable’) installations.

Pitless Weighbridge

Benefits Of Pitless Type Weighbridges

Suitable for installation on surface which saves 60% cost of civil construction

Platform above ground level- No water logging during rainy season

In Pitless weighbridges RCC ramp work must be required at least 3 meters for both sides for easy movement of vehicle

Absence of moving parts and therefore little maintenance

WhatsApp Image 2020-12-29 at 6.43.12 PM

Structure is installed on ground and have joists on the sides.

Easy Installation & maintenance as all parts are accessible above ground level and therefore a profitable investment.

Easy maintenance since all parts accessible above ground level

Designed to install on hard rock area where pit excavation is not possible for more than three feet.

Easy cleaning with water hose pipe or compressor.

Product Showcase

Product Video

Toll-free Number

+91 9904078668 +91 9904078673

Let us Know Your Requirements by Filling Form

Our Customer Care Department will approach you Within 24 Hrs.

Please Fill The form